Our Work : Surveying

Representative Project


Bowie State University Campus
Bowie, Maryland


Services provided include:

• Site Engineering
• Landscape Architecture
• Civil Engineering
• Structural Engineering
• Surveying
• Site Utilities
• Entrance Design
• Paving and Curbing
• Studio 3D Campus Site Rendering

Davis, Bowen & Friedel, Inc. serves as prime consultant in cooperation with subconsultants William F. Kirwin, Inc., Allen & Shariff Corporation and John D. Hynes & Associates for campus site improvements at Bowie State University. The project includes campus entrance improvements including image walls, landscaping, lighting, and turn lanes. Campus roadway improvements, including a new section of Loop Road, round-a-bouts, and closure of Jericho Park Road are also being performed. Design and construction of campus quadrangle improvements with brick walkways, plazas, landscaping, lighting, and irrigation are included. Davis, Bowen & Friedel, Inc. is also providing design for athletic fields including a softball field and two practice soccer fields. Stormwater management improvements, wetland enhancements and augmentation of the existing main water distribution system are also included as part of this project.

Davis, Bowen & Friedel, Inc. is preparing the sediment and stormwater management plan for this project, in accordance with the 2000 Maryland Stormwater Design Manual. Specifications for erosion control practices during construction, design of qualitative management structures, and hydraulic analysis of existing and proposed stormwater conveyance systems are being provided.

As part of this project, Studio 3D developed a simple, 3D aerial model for the Bowie State University campus publications and website. The model included proposed site modifications and new facilities.

Client interim evaluation remarks (12/20/01):

"The project is very tight on budget and schedule. Davis, Bowen & Friedel, Inc., have cooperated very well during the design phase of the project. The documents are developed with alternatives to stay within budget. The firm did a detailed study for augmenting the existing main water distribution to eliminate the need for an elevated water tank for fire fighting purposes. The revised scheme for augmenting the water distribution system was accepted by the Fire Marshall. The elimination of the elevated water tank resulted in a savings of $660K. The firm works well as a team."

Davis, Bowen & Friedel, Inc., received an overall rating of "Above Average" on this client evaluation.

Phases II and III are designed with construction still pending.